Pyrmont contains 4 Long Day Care centres (265 places), 1 preschool/kindergarten facility (30 places) and 1 OSHC facility (30 places) on a resident basis — though likely far tighter supply once significant daily workforce inflows to the area are considered. Combined service provision across long day care and preschool/kindergarten services, and the approximate 445 children in the cohort, sees a ratio of children per place of 1.5 - placing the area above the national average for supply per child on a resident basis, though closer to ~1.8 once estimated daytime workforce inflow is factored in. Looking at long day care specifically against the under-5 population, the ratio is 1.7 children per place. Further breakdowns by age, to help in identifying the most in-need services, show moderate LDC provision across the infant and toddler cohort (<3yo) with 265 places across 4 facilities serving 271 children while preschool supply is strong with 1 facility providing 30 places (6.0 children aged 3-4 per place compared to the Greater Sydney average of 8.3). With projected population growth of 28.5% between now and 2041, and 8.5% in the under 5 age group in particular, 20 new places will be needed to maintain today's ratios. As well as this projected growth, other drivers of note in the area are high female labour force participation of 63.6%, as well as strong income performance.
Proximity analysis saw distances of local residents to their nearest child care centre being shorter than average while high fees are observed despite adequate supply suggesting premium positioning or quality differentiation.
3 school catchments intersect Pyrmont (note; school catchment data provided for public schools only), in which a combined 6,443 children aged under 5 reside, served by 7,385 LDC and preschool places. The overall demand-to-supply ratio across these catchments is 0.9 children per place, with limited variance in this ratio. Meanwhile, the discrepancy in this ratio between Pyrmont and the intersecting school catchments highlights the need for a catchment based approach for specific site assessments.