Naremburn contains 4 Long Day Care centres (262 places) on a resident basis — though likely far tighter supply once significant daily workforce inflows to the area are considered. With no preschool/kindergarten services observed in the area, only long day care, the ratio of children per place for the under 5 age group is 1.4 - placing the area above the national average for supply per child on a resident basis, though closer to ~1.8 once estimated daytime workforce inflow is factored in. With projected population growth of 42.7% between now and 2041, and 17.6% in the under 5 age group in particular, 110 new places will be needed to maintain today's ratios. As well as this projected growth, other drivers of note in the area are high female labour force participation of 69.1%, as well as strong income performance.
In assessing child care markets local school supply is a particularly important factor, given school-run convenience, and enrolment vs child care place analysis can provide useful insight into capacity both for parents seeking child care options and child care operators assessing opportunities in an area. The catchment sees a level of school enrolment relative to population of 0.4 per 100 residents with 29 enrolments across primary and secondary institutions. A lower-than-typical rate which suggests pressure might be taken off local services somewhat by school hubs in nearby areas. As expected, the level of school places per child care place (LDC+PSK) is also lower than average. Proximity analysis saw distances of local residents to their nearest child care centre being shorter than average.
8 school catchments intersect Naremburn (note; school catchment data provided for public schools only), in which a combined 8,704 children aged under 5 reside, served by 9,563 LDC and preschool places. The overall demand-to-supply ratio across these catchments is 0.9 children per place, with limited variance in this ratio. Meanwhile, the discrepancy in this ratio between Naremburn and the intersecting school catchments highlights the need for a catchment based approach for specific site assessments.