1.Territory Energy Link
Energy
PlanningA multi-user, multi-asset infrastructure corridor running approximately 670km from near Elliott to the Middle Arm Precinct in Darwin. Formerly known as the Tennant Creek to Darwin Infrastructure Corridor, the project is currently in Stage 2 (feasibility phase) of a four-stage program, following completion of a 2024 prefeasibility study that identified a preliminary alignment within a 530m wide study area. The final corridor is expected to be approximately 130m wide and will support buried services including gas, water, optical fibre and future hydrogen pipelines, connecting the Beetaloo Sub-basin to the Middle Arm Precinct and other strategic infrastructure in Darwin.