Armadale contains 6 Long Day Care centres (408 places) and 3 OSHC facilities (127 places), while overall provision relative to the local child population appears limited compared to national benchmarks, and is below the Greater Perth average. With no preschool/kindergarten services observed in the area (such services generally provided within schools in WA), only long day care, the ratio of children per place for the under 5 age group is 2.9 - placing the area among the bottom 30% nationally for supply per child. With projected population growth of 14.1% between now and 2041, and 0.2% in the under 5 age group in particular. As well as this projected growth, other factors worth noting are lower female labour force participation of 44.2%, as well as lower quartile employment and income performance.
In assessing child care markets local school supply is a particularly important factor, given school-run convenience, and enrolment vs child care place analysis can provide useful insight into capacity both for parents seeking child care options and child care operators assessing opportunities in an area. The catchment sees a level of school enrolment relative to population of 20.5 per 100 residents with 3,357 enrolments across primary and secondary institutions. This notably elevated rate of school supply suggests many students travel to the area from beyond the immediate surrounds, typically amplifying local childcare demand given school-run proximity. As expected, the level of school places per child care place (LDC+PSK) is also higher than average. Proximity analysis saw distances of local residents to their nearest child care centre being relatively in line with national benchmarks.
8 school catchments intersect Armadale (note; school catchment data provided for public schools only), in which a combined 7,659 children aged under 5 reside, served by 4,791 LDC and preschool places. The overall demand-to-supply ratio across these catchments is 1.6 children per place, with limited variance in this ratio. Meanwhile, the discrepancy in this ratio between Armadale and the intersecting school catchments highlights the need for a catchment based approach for specific site assessments.